RESUME Data Lelang e-Proc

DATA LELANG TAHUN 2017

REKAPITULASI LAPORAN PENGADAAN BARANG/JASA KABUPATEN LOMBOK TENGAH

Kondisi sampai dengan tanggal 26 Sep 2017











TABEL REKAPITULASI HASIL LELANG PER TAHUN
MELALUI LPSE KABUPATEN LOMBOK TENGAH TAHUN 2011 - 2017

No.
Tahun
Paket (Paket)
Paket Selesai (Paket)
Pagu (Rp.)
Pagu Selesai (Rp.)
Nilai Penawaran Terkoreksi (Rp.)
Selisih (Rp.)
Prosentase (%)
1
2017
91
88
186.531.388.865
183.865.418.865
168.693.855.959
15.171.562.906
8,13
2
2016
120
120
303.657.698.580
303.657.698.580
276.726.479.935
26.931.218.645
8,87
3
2015
131
131
131.388.986.753
131.388.986.753
114.752.600.122
16.636.386.631
12,66
4
2014
90
90
88.644.120.024
88.644.120.024
77.549.603.654
11.094.516.370
12,52
5
2013
101
101
238.811.336.361
238.811.336.361
226.939.604.150
11.871.732.211
4,97
6
2012
180
176
298.813.635.624
296.243.040.624
272.346.210.900
24.136.828.724
8,07
7
2011
20
20
16.819.638.898
16.819.638.898
15.997.605.700
822.033.198
4,89
JUMLAH
733
726
1.264.666.805.105
1.259.430.240.105
1.153.005.960.420
106.664.278.685
8,43

JUMLAH LELANG PER-BULAN TAHUN 2017

No. BULAN PAGU DANA
(Rp.)
HPS
(Rp.)
PAKET LELANG SELESAI
(Paket)
PAKET LELANG
DALAM PROSES
(Paket)
TOTAL PAKET LELANG
(Paket)
1
Sedang Proses
2.665.970.000
2.616.882.000
0
3
3
2
09-Sep
16.310.350.000
16.178.697.394
12
0
12
3
08-Ags
18.337.570.700
18.214.865.370
19
0
19
4
07-Jul
13.158.926.015
13.001.231.613
12
0
12
5
06-Jun
10.949.102.000
10.874.071.127
9
0
9
6
05-Mei
123.916.700.550
123.606.577.040
29
0
29
7
04-Apr
1.192.769.600
1.169.701.000
7
0
7
JUMLAH
186.531.388.865
185.662.025.543
88
3
91

JUMLAH LELANG BERDASARKAN KATEGORI TAHUN 2017

No.
KATEGORI LELANG
PAGU DANA (Rp.)
PAKET LELANG SELESAI
(Paket)
PAKET LELANG DALAM PROSES
(Paket)
TOTAL PAKET LELANG
(Paket)
1
Pekerjaan Konstruksi
160.988.450.015
50
1
51
2
Jasa Konsultasi
10.577.982.150
28
0
28
3
Pengadaan Barang
14.413.266.700
10
1
11
4
Jasa Lainnya
551.690.000
0
1
1
JUMLAH
186.531.388.865
88
3
91

JUMLAH LELANG BERDASARKAN METODE PEMILIHAN TAHUN 2017

No.
KATEGORI LELANG
PAGU DANA (Rp.)
PAKET LELANG SELESAI
(Paket)
PAKET LELANG DALAM PROSES
(Paket)
TOTAL PAKET LELANG
(Paket)
1
e-Lelang Pemilihan Langsung
47.616.730.015
38
1
39
2
e-Seleksi Sederhana
3.238.212.550
21
0
21
3
e-Lelang Umum
113.371.720.000
12
0
12
4
e-Lelang Sederhana
11.607.556.700
9
2
11
5
e-Seleksi Umum
7.339.769.600
7
0
7
6
e-Lelang Cepat
3.357.400.000
1
0
1
JUMLAH
186.531.388.865
88
3
91

TABEL REKAPITULASI DATA LELANG PER SKPD TAHUN 2017

No NAMA SKPD PAGU DANA
(Rp.)
KONTRAK
(Rp.)
SELISIH LELANG
(Rp.)
PROSENTASE
(%)
JUMLAH PAKET
(Paket)
1
BAPENDA
376.080.000
0
0
0,00
1
2
DPU PR
132.309.773.000
121.999.602.866
10.310.170.134
7,79
38
3
DISPARBUD
4.046.000.000
3.178.141.286
867.858.714
21,45
10
4
RSUD
12.505.489.600
11.680.353.501
825.136.099
6,60
4
5
DIKES
4.915.762.550
4.353.776.000
561.986.550
11,43
3
6
DIPERINDAG
2.182.175.000
1.716.292.340
465.882.660
21,35
2
7
DISHUB
8.017.900.000
7.582.134.300
435.765.700
5,43
7
8
DISKOP UKM
1.539.000.000
1.163.973.087
375.026.913
24,37
1
9
DISDIK
4.031.200.000
2.006.844.465
286.155.535
7,10
4
10
DINPERKIM
1.318.599.700
1.135.428.472
183.171.228
13,89
2
11
DISTAN
4.834.132.000
4.655.888.600
178.243.400
3,69
4
12
PDAM
2.532.015.000
2.353.956.000
178.059.000
7,03
1
13
SETDA
4.406.090.000
3.722.359.158
132.040.842
3,00
3
14
ITDA
417.750.000
334.126.000
83.624.000
20,02
1
15
DINSOS
416.525.000
335.554.000
80.971.000
19,44
1
16
DISLUTKAN
626.401.015
546.467.458
79.933.557
12,76
1
17
BPN
256.496.000
205.402.027
51.093.973
19,92
1
18
DISDUKCAPIL
870.000.000
825.225.500
44.774.500
5,15
2
19
BAPPEDA
930.000.000
898.330.900
31.669.100
3,41
5
JUMLAH
186.531.388.865
168.693.855.959
15.171.562.906
8,13
91

DAFTAR PAKET LELANG TAHUN 2017

No NAMA PENYEDIA NPWP PAGU DANA
(Rp.)
HPS
(Rp.)
HARGA PENAWARAN
TERKOREKSI
(Rp.)
SUMBER
DANA
NAMA PAKET LELANG SKPD
1 PT. Damai Indah Utama
01.113.143.0-911.000
19.500.000.000
19.500.000.000
18.856.692.000
APBD
Pembangunan Gedung Kantor DPRD (Gedung Paripurna) DPU PR
2 PT. Lombok Infrastruktur Perkasa
03.311.062.8-911.000
11.340.000.000
11.311.176.000
10.965.962.000
APBD
Peningkatan Jalan Kabupaten Paket VI dengan Ruas Ranggagata - Gerunung 2.40 Km, Pelambik - Ranggagata 3 Km Total Panjang 5.40 Km DPU PR
3 PT. BAHAGIA BANGUNNUSA
01.144.719.0-914.000
10.950.000.000
10.929.225.000
10.469.993.000
APBD
Peningkatan Jalan Kabupaten Paket III dengan Ruas Montong Dao - Selewat 3 Km, Benjor - Setiling 3 Km, Total Panjang 6 Km DPU PR
4 PT. PRAMANA ARTHA RAHARJA
01.512.561.0-904.000
9.500.000.000
9.476.671.000
8.997.695.000
APBD
Peningkatan Jalan Kabupaten Paket VIII dengan Ruas Bilelando - Kelongkong 5.20 Km DPU PR
5 PT. BUMI PERMATA KENDARI
02.832.926.6-811.000
9.621.720.000
9.621.656.000
8.900.898.000
APBD
PEMBANGUNAN RUANG POLIKLINIK TAHAP II RSUD
6 PT. KESAWA KARYA ABADI
01.414.000.8-915.000
9.130.000.000
9.110.636.000
8.637.684.000
APBD
Peningkatan Jalan Kabupaten Paket VII dengan Ruas Barabali - Bangak 3.70 Km, Bujak - Muncan 1.20 Km Total Panjang 4.90 Km DPU PR
7 PT. MARDIKA GRIYA PRASTA
01.543.591.0-904.000
8.930.000.000
8.911.975.000
8.379.397.000
APBD
Peningkatan Jalan Kabupaten Paket IX dengan Ruas Selawang - Bunmas 2.2 Km, Pejanggik - Lajut 2.50 Km Total Panjang 4.70 Km DPU PR
8 PT. AJI KARYA
02.924.157.7-914.000
8.175.000.000
8.155.328.000
7.721.729.000
APBD
Peningkatan Jalan Kabupaten Paket II dengan Ruas Penimpoh - Batas Lotim 2 Km, Lingkok Lime - Bual 2.5 Km, Total Panjang 4.50 Km DPU PR
9 PT. SURYA KARYA SARI
01.112.425.2-904.000
8.020.000.000
8.007.303.000
7.570.972.000
APBD
Peningkatan Jalan Kabupaten Paket V degan Ruas Leneng - Tenganan 2.40 Km, Kalisade - Bunut Baok 2.20 Km, total Panjang 4.60 Km DPU PR
10 PT. Bumiagung Annusa
01.213.219.7-914.000
7.410.000.000
7.398.576.000
6.652.369.000
APBD
Peningkatan Jalan Kabupaten Paket IV dengan Ruas Pemepek - Repok Pidendang 1.70 Km, Barejulat - Bunsalak 2.20 Km, Total Panjang 3.90 Km DPU PR
11 PT. INDOMINE UTAMA
02.721.027.7-914.000
5.670.000.000
5.653.557.000
5.379.013.000
APBD
Peningkatan Jalan Kabupaten Paket X dengan Ruas Penaban - Jago 2.70 Km DPU PR
12 PT. SURYA KARYA SARI
01.112.425.2-904.000
5.125.000.000
5.120.968.000
4.911.925.000
APBD
Peningkatan Jalan Kabupaten Paket I dengan Ruas (Jl. Ahmad Yani 0.90 Km,Jl. Agus Salim 0.50 Km. Jl. Sultan Hasanudin 1 Km, dan Jl. WR. Supratman (Jln. Merapi) 0.25 Km Total Panjang 2.65 Km DPU PR
13 PT. CIPTA CAHAYA AQILLAH
02.906.407.8-006.000
4.600.000.000
4.598.265.000
4.335.872.000
APBD
Pembangunan Dermaga Apung di Kute DISHUB
14 PT. BAJA MANUNGGAL PERKASA
01.468.372.6-424.000
4.510.000.000
4.509.900.000
4.169.900.000
APBD
Relokasi Puskesmas Ganti (Rumah Dinas Dokter, Rumah Dinas Bidan, Pemagaran, Selasar, Penataan Halaman, Instalasi Air dan istrik) DIKES
15 PT. MONODON PILAR NUSANTARA
71.794.335.1-101.000
4.244.000.000
4.243.297.300
3.732.590.000
APBD
Biaya Pematangan Lahan DPU PR
16 PT. YODYA KARYA (PERSERO)
01.001.616.0-093.000
4.000.000.000
3.927.682.000
3.368.970.000
APBD
Konsultan Manajemen Konstruksi Pembangunan Gedung Kantor Bupati Kab. Lombok Tengah DPU PR
17 PT. AKABA CITRA PERDANA
31.276.199.2-075.000
3.357.400.000
3.354.779.999
3.348.602.400
APBD
Belanja Barang Yang Akan Diserahkan Kepada Masyarakat/Pihak Ketiga SETDA
18 PT.ANUGRAH MANGGALA MATARAM
01.514.092.4-915.000
2.779.900.000
2.776.387.000
2.630.012.000
APBD
Pembangunan Dermaga Apung di Selong Belanak DISHUB
19 sarana konstrindo mandiri
80.649.355.7-914.000
3.167.000.000
3.166.232.028
2.549.634.107
APBD
Rehabilitasi Jaringan Irigasi DI Sidemen (4034 m) Dana DAK DPU PR
20 PT. TIRTA BUANA LUHUR
31.784.064.3-906.000
2.532.015.000
2.532.015.000
2.353.956.000
BUMD
Pengadaan Water Meter dia 0,5 inch dan ACC Rangkaian dia 0,5 inch PDAM
21 CV. HISYAM PUTRA
02.392.968.0-915.000
2.200.500.000
2.167.770.000
2.141.250.000
APBD
Belanja barang fisik yang akan diserahkan kepada masyarakat (Sapi Bali) DISTAN
22 SEDAYA BANGUN PERSADA
75.220.114.5-914.000
2.600.000.000
2.599.311.299
2.026.771.582
APBD
Rehabilitasi Jaringan Irigasi DI Embung Brenge (2144 m) Dana DAK DPU PR
23 CV. DIAN MULYA
01.461.508.2-915.000
2.400.000.000
2.398.986.537
1.934.363.643
APBD
Rehabilitasi Jaringan Irigasi DI Dao (4580 m) Dana DAK DPU PR
24 LANGGENG BERDIKARI
74.314.902.3-914.000
2.100.000.000
2.100.000.000
1.884.858.865
APBD
Pembangunan gedung kantor dinas dikpora DISDIK
25 CV. WAHYU HIDAYAT
74.934.273.9-911.000
1.850.000.000
1.850.000.000
1.811.288.000
APBD
PENGEMBANGAN PENGOLAHAN LIMBAH KAPASITAS 300 TT (DBHPR) RSUD
26 CV. GENERASI HIJAU
74.857.844.0-911.000
1.780.000.000
1.773.197.532
1.420.969.705
APBD
Rehabilitasi Jaringan Irigasi DI Benjor (3043 m) Dana DAK DPU PR
27 CV. BATU KEMERAS INDAH
01.237.068.0-914.000
1.539.000.000
1.476.558.248
1.163.973.087
APBD
Pengadaan barang yang akan diserahkan ke masyarakat - Terop DISKOP UKM
28 CV. BERKAT DOA
02.295.128.9-915.000
1.300.000.000
1.297.503.200
1.055.055.951
APBD
Rehabilitasi Jaringan Irigasi DI Guleliat (1908 m) Dana DAK DPU PR
29 CV. MJ MANDIRI
31.621.903.9-915.000
1.126.000.000
1.098.630.000
1.036.500.000
APBD
Belanja barang fisik yang akan diserahkan kepada masyarakat (Kambing PE Lokal) DISTAN
30 CV. WIJAYA CIPTA UTAMA
73.414.343.1-915.000
1.000.000.000
996.326.000
963.561.000
APBD
Peningkatan DKK Praya Timur (Mujur) DPU PR
31 CV. AMRIDA
01.204.455.8-915.000
1.091.087.500
1.033.147.000
861.298.550
APBD
Revitalisasi Pasar Desa Batu Bungus ( DAK ) DIPERINDAG
32 CV. REZEKI MULIA
74.654.967.4-915.000
1.091.087.500
1.068.740.000
854.993.789
APBD
Revitalisasi Pasar Desa Pringgarata (DAK) DIPERINDAG
33 PT. WIMA WAYA NUSANTARA
03.139.312.7-821.000
1.000.000.000
978.300.000
795.000.000
APBD
Perencanaan Teknis Master Plan dan DED (Detail Enginering Design) Pembangunan Pariwisata di Kawasan Utara DISPARBUD
34 PT. POLA DATA CONSULTANT (PDC)
01.464.313.4-542.000
756.000.000
755.716.000
755.557.000
APBD
Revieu DED Gedung Kantor Bupati dan Penyusunan Masterplan Kawasan Perkantoran Kab. Loteng DPU PR
35 UD SINAR MUTIARA
08.421.756.1-911.000
769.200.000
768.299.400
752.705.000
APBN
fasilitasi bantuan sarana produksi cabai besar DISTAN
36 UD.LANGGENG
08.412.629.1-914.000
738.432.000
736.464.960
725.433.600
APBN
fasilitasi bantuan sarana produksi cabai rawit DISTAN
37 MUJAHID SUKSES
74.989.510.8-915.000
750.000.000
749.968.515
697.479.501
APBD
PEMBUATAN SUMUR BOR (DAU) RSUD
38 cv.aleale
71.961.757.3-915.000
668.599.700
665.889.675
641.311.275
APBD
Pemugaran rumah tidak layak huni di kabupaten lombok tengah DINPERKIM
39 CV. DENDE PUTRI
76.470.372.4-914.000
626.401.015
626.400.983
546.467.458
APBD
Revitalisasi Tempat Pelelangan Ikan DISLUTKAN
40 CV. ANUGRAH KARYA RIZQI
02.627.289.8-915.000
650.000.000
643.800.875
545.814.144
APBD
Rehabilitasi Jaringan Irigasi DI Lantan (838 m) Dana DAK DPU PR
41 CV.HADI KARYA
80.953.019.9-914.000
650.000.000
648.665.076
494.117.197
APBD
Penataan Lapangan Bundar Praya (PSLT) DINPERKIM
42 CV. RONA LESTARI
01.592.581.1-606.000
500.000.000
499.653.000
477.900.000
APBD
Penyusunan Analisis Mengenai Dampak Lingkungan (AMDAL) Kawasan Perkantoran Kab. Lombok Tengah DPU PR
43 CV. MEGAKARYA
75.180.962.5-915.000
660.000.000
660.000.000
477.273.336
APBD
Belanja Modal Jalan, Irigasi dan Jaringan - Pengadaan Jalan Khusus -Pembuatan Jalan Setapak di Kawasan Aiq Bukaq DISPARBUD
44 PT. STACOPA RAYA
01.300.839.6-034.000
470.000.000
469.953.000
464.007.500
APBD
Pengadaaan Belangko Kartu Keluarga (KK) DISDUKCAPIL
45 CV. CIPTAMAS GLOBAL SARANA
81.204.419.6-915.000
600.000.000
600.000.000
446.718.583
APBD
Belanja Modal Jalan, Irigasi dan Jaringan - Pengadaan Jalan Khusus -Pembuatan Jalan Setapak di Pantai Mawun DISPARBUD
46 CV.YORANUSA ABADI
01.514.327.5-915.000
619.362.000
604.356.704
431.593.046
APBD
Pengadaan dan Pemasangan Pipa dan ACC di Desa Gemel Kec. Jonggat DPU PR
47 CV. MUSTIKA BERINGINMAS
01.514.157.5-915.000
636.660.000
619.909.287
420.613.948
APBD
Pengadaan dan Pemasangan Pipa dan ACC di Pengadang - Beraim Kec. Praya Tengah DPU PR
48 CV. NUANSA ABADI
01.658.788.3-915.000
602.682.000
586.233.448
407.007.282
APBD
Pengadaan dan Pemasangan Pipa dan ACC di Dasan Baru - Ld.Kekah Desa Tampak Siring Kec. Batukliang DPU PR
49 CV. ADI CIPTA
01.513.807.6-911.000
400.000.000
398.915.000
396.800.800
APBD
Konsultan Perencanaan Gedung Kantor Pemerintah DPU PR
50 cv. tekun
03.231.875.0-915.000
551.972.000
536.066.261
393.700.845
APBD
Pengadaan dan Pemasangan Pipa dan ACC di Pelambik - Krekok Kec. Praya Barat Daya DPU PR
51 CV. DANICA TIRTA
02.627.349.0-915.000
583.632.000
567.333.203
392.337.863
APBD
Pengadaan dan Pemasangan Pipa dan ACC di Batu Bolong - Ungga Kec. Praya Barat Daya DPU PR
52 CV. ADI CIPTA
01.513.807.6-911.000
400.000.000
397.100.000
385.854.000
APBD
Konsultan Pengawasan Pembangunan Gedung Kantor DPRD (Gedung Paripurna) DPU PR
53 SAMAWA TALINDO RESOURCE
80.672.236.9-913.000
422.237.000
410.955.190
378.274.511
APBD
Pengadaan dan Pemasangan Pipa dan ACC di Dusun Open Desa Mangkung Kec. Praya Barat DPU PR
54 cv. cahaya galaxy
75.506.689.1-915.000
497.000.000
455.784.195
373.756.758
APBD
Pemeliharaan Rutin / Berkala Rumah Jabatan/Pembangunan Guest House Rumah Jabatan Wakil Bupati SETDA
55 CV. MUSTIKA TERATAIMAS
02.392.893.0-915.000
557.858.000
547.920.456
365.826.579
APBD
Pengadaan dan Pemasangan Pipa dan ACC di Barejulat Kec. Jonggat DPU PR
56 PT. Argenta Teknologi Mandiri
80.123.221.6-017.000
400.000.000
399.612.840
361.218.000
APBD
pengadaan perangkat alat perekaman KTP-el DISDUKCAPIL
57 CV. DINA UTAMA
71.971.994.0-915.000
416.525.000
416.525.000
335.554.000
APBD
Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Kantor DINSOS
58 CV. DINA UTAMA
71.971.994.0-915.000
417.750.000
417.724.220
334.126.000
APBD
Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Kantor ITDA
59 CV TANDUR SINARY
02.295.139.6-915.000
400.000.000
400.000.000
295.206.674
APBD
Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Pertokoan/Koperasi/Pasar -Pembangunan Plaza Pusat Jajanan/Kuliner di Aiq Bukaq DISPARBUD
60 CV. GOPARA BERJAYA BERSAMA
76.844.155.2-435.000
412.920.000
358.417.428
284.891.860
APBD
Pengadaan Aspal Drum untuk Pemeliharaan Rutin Jalan Kabupaten DPU PR
61 CV. DANASADY Consultant
01.884.094.2-914.000
283.769.600
283.100.000
270.688.000
APBD
Pengawasan Pembangunan Ruang Poliklinik tahap II RSUD
62 CV. WIRANG PATUT
75.066.806.3-915.000
300.000.000
300.000.000
248.149.904
APBD
Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Tempat Pendidikan -Pembuatan Ruang Ganti/toilet di Aiq Bukaq DISPARBUD
63 Tunjung Tilah
66.208.261.9-915.000
250.000.000
249.999.000
229.239.826
APBD
Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Tempat Pendidikan -Pembuatan Ruang Ganti/toilet di Mawun DISPARBUD
64 CV. CIPTAMAS GLOBAL SARANA
81.204.419.6-915.000
240.000.000
240.000.000
222.842.489
APBD
Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Pertokoan/Koperasi/Pasar -Pembangunan Kios Cinderamata di Selong Belanak DISPARBUD
65 CV. MAMAS
01.112.679.4-915.000
256.496.000
256.495.637
205.402.027
APBN
Pekerjaan Konstruksi Pembangunan Pagar Kantor BPN
66 CV BALQIS SEJAHTERA
66.186.136.9-915.000
250.000.000
249.999.948
202.514.454
APBD
Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Tempat Pendidikan -Pembuatan Ruang Ganti/toilet di Selong Belanak DISPARBUD
67 cv tanjung religius
02.924.947.1-915.000
250.000.000
250.000.000
201.295.520
APBD
Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Pertokoan/Koperasi/Pasar -Pembangunan Kios Cinderamata di Mawun DISPARBUD
68 PT. Tri Patra Konsultan
31.401.829.2-543.000
225.000.000
199.351.900
199.131.900
APBD
Study Kelayakan Pusat Olahraga BAPPEDA
69 PT. Wastu Anopama
02.755.249.6-541.000
195.000.000
194.869.000
193.786.000
APBD
Belanja jasa konsultansi perencanaan - Studi kelayakan perdagangan baru BAPPEDA
70 CV. WANDA Konsultan
02.924.508.1-915.000
190.000.000
190.000.000
185.885.700
APBD
Rencana Induk Transportasi Kabupaten DISHUB
71 PT. Ganeshaglobal Sarana
01.728.190.8-904.000
180.000.000
179.630.000
176.616.000
APBD
Belanja jasa konsultansi perencanaan - Studi kelayakan kependudukan dan kemampuan ekonomi perkotaan praya BAPPEDA
72 PT. Yudhilla Angghalia
02.103.208.1-911.000
175.450.000
175.274.000
174.713.000
APBD
Penyusunan Data Base Pengairan DPU PR
73 PT. DIRA BINA NUSA
71.883.318.9-609.000
170.000.000
169.926.000
169.761.000
APBD
Belanja jasa konsultansi perencanaan - Studi kelayakan pemerintahan BAPPEDA
74 CV. Karya Mahardika 97
01.784.126.3-915.000
168.000.000
167.960.100
161.288.600
APBD
Biaya perencanaan dermaga apung di kute DISHUB
75 CV MONUMENTAL
02.780.931.8-543.000
160.000.000
159.311.000
159.036.000
APBD
Belanja jasa konsultansi perencanaan - kajian potensi daerah dan sosial budaya perkotaan praya BAPPEDA
76 CV. CITRA ADI DAYA CONSULTAN
02.295.005.9-911.000
175.000.000
169.786.000
150.000.000
APBD
Konsultan Pengawasan Peningkatan Jalan Dana DAK Paket IV DPU PR
77 CV. GEO DaSE Consultant
03.004.305.3-915.000
175.000.000
169.786.000
135.080.000
APBD
Konsultan Pengawasan Peningkatan Jalan Dana DAK Paket I DPU PR
78 CV. ARCHI TEKNIK
01.226.068.3-911.000
175.000.000
169.786.000
125.576.000
APBD
Konsultan Pengawasan Peningkatan Jalan Dana DAK Paket II DPU PR
79 CV. DARMA CITRA UTAMA
01.562.420.8-805.000
120.000.000
119.999.990
117.744.000
APBD
Biaya Perencanaan Dermaga Apung di Selong Belanak DISHUB
80 CV. WANDA Konsultan
02.924.508.1-915.000
175.000.000
169.786.000
105.000.000
APBD
Konsultan Pengawasan Peningkatan Jalan Dana DAK Paket III DPU PR
81 CV. WANDA Konsultan
02.924.508.1-915.000
225.362.550
199.727.000
99.000.000
APBD
Konsultan Perencanaan Relokasi Puskesmas Ganti (Rumah Dinas Dokter, Rumah Dinas Bidan, Pemagaran, Selasar, Penataan Halaman, Instalasi Air dan istrik DIKES
82 CV. BINA INTI RANCANG Konsultan
01.784.365.7-911.000
90.000.000
89.952.500
85.332.000
APBD
Biaya pengawasan dermaga apung di kute DISHUB
83 CV. WANDA Konsultan
02.924.508.1-915.000
180.400.000
147.427.500
84.876.000
APBD
Konsultan Pengawasan Relokasi Puskesmas Ganti (Rumah Dinas Dokter, Rumah Dinas Bidan, Pemagaran, Selasar, Penataan Halaman, Instalasi Air dan istrik DIKES
84 KJPP Pung S Zulkarnain & Rekan
21.046.880.7-071.000
100.000.000
99.935.000
77.715.000
APBD
Biaya APRAISAL Pembebasan Lahan Jalan Jend. Sudirman (Pos Polosi - Biao) DPU PR
85 CV. ASRID BINA UTAMA
01.884.093.4-911.000
113.000.000
113.000.000
69.900.600
APBD
Perencanaan pembangunan gedung DISDIK
86 CV. BINA INTI RANCANG Konsultan
01.784.365.7-911.000
70.000.000
69.850.000
66.000.000
APBD
Biaya pengawasan dermaga apung di selong belanak DISHUB
87 CV. ASRID BINA UTAMA
01.884.093.4-911.000
96.000.000
94.457.000
59.900.500
APBD
Biaya Jasa Perencanaan untuk selong belanak, Mawun, Mawi dan Are Guling DISPARBUD
88 CV.TRIPOD
01.226.017.0-911.000
80.000.000
79.970.110
52.085.000
APBD
Pengawasan pembangunan gedung DISDIK